After a weekend of not much work, quite a bit was accomplished today. Inside the house all of the tile was installed throughout the entire house and some of it was grouted. The attic door was installed. Outside, the cement pool equipment stand that had floated due to the rain was repaired and the pool equipment installed. The pool light switch was installed right outside the bedroom door. All of the pool plumbing is now complete and the flagstone around the edge of the pool was set in place. Last but not least, one more picture of the front of the house with the garage door down and the new walkway and front step.
1 comment:
Looks great!
Won't be long.
Nice pics Robin!
Carl
Post a Comment